Rubistar
Rubric Made Using:
RubiStar ( http://rubistar.4teachers.org )



    Building A Structure : Popsicle Bridge Building Project


    Teacher Name: Mrs. Chaffin


    Student Name:     ________________________________________

CATEGORY
3 Exemplary
2 Accomplished
1 Developing
0 Beginning
Requirements
All requirements are met: ~60 cm in length ~Able to stand on supports ~Car can drive through 4 cm roadway. ~Bridge clears 15 cm height requirement.
Most requirements are met: ~60 cm in length ~Able to stand on supports ~Car can drive through 4 cm roadway. ~Bridge clears 15 cm height requirement.
Few requirements are met: ~60 cm in length ~Able to stand on supports ~Car can drive through 4 cm roadway. ~Bridge clears 15 cm height requirement.
No requirements are met: ~60 cm in length ~Able to stand on supports ~Car can drive through 4 cm roadway. ~Bridge clears 15 cm height requirement.
Weight/Load
Bridge help large weight/load (maximum load or more) before collapsing.
Bridge held average load before collapsing.
Bridge is weak. Held very little weight/load (minimum load) before collapsing.
Bridge held no weight/load before collapsing.
Structure Appearance
~Bridge has a clear theme for structure. ~Bridge is extremely neat. (No glue clumps and no error in stick alignment) ~Framework is perfect with no pattern errors.
~Bridge structure has a theme that can be seen. ~Structure is relatively neat. (Few glue clumps and few errors in stick alignment) ~Framework pattern has minor inconsistent errors.
~Bridge has somewhat of a theme structure. ~Structure is lacking neatness. (Has glue clumps and most of the sticks are not aligned properly.) ~Framework pattern has some inconsistent work.
~Bridge has no over all theme of structure. ~Structure is not neat.(Glue clumps everywhere and no sticks are aligned correctly) ~Structure is very inconsistent with framework pattern
Group Collaboration
~Excellent collaboration skills. ~Great communication ~No problems delegating and distributing task.
~Good collaboration skills. ~ Fair communication ~Minor problems delegating and distributing task.
~Several problems working in a group project. ~Poor communication ~Difficulty delegating and distributing task.
~No group collaboration. Obvious that one person did all the work.


 Teacher Home



Copyright © 2000-2007 Advanced Learning Technologies in Education Consortia ALTEC

To view information about the Privacy Policies and the Terms of Use, please go to the following web address:
http://rubistar.4teachers.org/index.php?screen=TermsOfUse