![]() |
Rubric Made Using:
RubiStar
( http://rubistar.4teachers.org )
|
|
CATEGORY
|
4-Excellent!
|
3-Very Good
|
2-Satisfactory
|
1-Incomplete
|
0-Unsatisfactory
|
All Assignments Complete
|
All work is done above and beyond standards
|
All work meets and slightly exceeds standards
|
All work meets standards
|
Work falls short of standards
|
Work is not completed
|
Follow Directions
|
There is evidence that all directives are followed completely
|
Directives are followed for the most part with some slight deviations
|
Directions are somewhat followed
|
Little evidence of student following instructions
|
No evidence of student following directions
|
Grammar/Structure
|
Grammar and structure meet what is required of educational level
|
Grammar and structure approach the standard with some very minor mistakes
|
One or two mistakes, student realizes and has made attempt to neatly correct mistakes
|
Between three and five grammatical and or spelling and punctuation errors
|
Mistakes in all phases of the project. Improper punctuation, grammar and spelling
|
Neatness
|
All work is perfect
|
Work shows minor imperfections
|
Work is hard to read and some mistakes are apparent
|
Hard to read, sloppy in most aspects
|
Illegible, mistakes crossed out
|
Completed in a Timely Manner
|
Project is done on or before time is up
|
Project is mostly completed before time is up
|
Project is completed but is handed in later than expected
|
Project is handed in within three days of the due date
|
Project is handed in more than four days after due date
|
Copyright © 2000-2007 Advanced Learning Technologies in Education Consortia ALTEC |